RPS' transportation engineering team completed the initial steps to add four miles of elevated express lanes on one of Houston’s most congested freeways, IH 610 (West Loop), between IH 10 West and IH 69 South (US 59). The intent is to have four new lanes, two in each direction, providing the capability to bypass the heavily traveled Galleria Area.Â
RPS prepared the schematic design and an Environmental Assessment for the construction of elevated express lanes. The project includes direct connectors to the IH 10 Managed Lanes. The Express Lanes will be tolled.  Our scope included public involvement, schematic design, bridge design, environmental documents and design visualization using a model.Â
IH 610 (West Loop) Express Lanes
Roads
Â
RPS had to obtain environmental documentation and prepare the schematic design for 4 elevated lanes through one of the busiest areas of Houston, Texas, the 4th largest city in the nation.
RPS completed the design and obtained the environmental documents while maintaining consistent messaging to the public about the project.
Your contact information:
All fields are mandatory *
RPS is committed to protecting and respecting your privacy. We will only use your personal information to administer your account and to provide the products and services you have requested. We would also like to contact you about our products and services, as well as other content that may be of interest to you.
Your contact information:
All fields are mandatory *
RPS is committed to protecting and respecting your privacy. We will only use your personal information to administer your account and to provide the products and services you have requested. We would also like to contact you about our products and services, as well as other content that may be of interest to you.