RPS completed preliminary engineering, final design, bid-phase and construction-phase services for expansion of the Trinity River Authority Livingston Water Supply System on Lake Livingston. The project included a raw water intake in Lake Livingston, a raw water pump station and approximately 5,000 linear feet of raw water transmission line. The 5 MGD plant expansion included a new raw water metering and flash mix structure, a new SUPERPULSATOR clarifier, conversion of two existing solids contact clarifiers to SUPERPULSATOR clarifiers, complete replacement of all chemical feed systems, new dual media filters with air scour backwash, new backwash pumping facilities, replacement of the 480-volt distribution system in the plant and addition of standby generators.Â
Livingston Regional Water Supply
Trinity River Authority (TRA)
Â
A nearby prison created some concerns about security.Â
RPS incorporated security measures into the design to protect the plant infrastructure and its employees.
Your contact information:
All fields are mandatory *
RPS is committed to protecting and respecting your privacy. We will only use your personal information to administer your account and to provide the products and services you have requested. We would also like to contact you about our products and services, as well as other content that may be of interest to you.
Your contact information:
All fields are mandatory *
RPS is committed to protecting and respecting your privacy. We will only use your personal information to administer your account and to provide the products and services you have requested. We would also like to contact you about our products and services, as well as other content that may be of interest to you.