Myton Green, Warwick

RPS undertook the civil engineering designs for a multi-phase residential scheme located between Leamington Spa and Warwick. This involved highways and drainage infrastructure designs, as well as the removal of an existing culverted section of the Myton Brook.

Key details

Project name

Myton Green, Warwick

Client

Catesby Estates

Location

Warwickshire, UK

Services provided

  • Civil engineering
  • Hydrology
  • Flood risk

Challenge

The design of the main spine road, which needed to cross the Myton Brook, presented a particular challenge. A correctly sized culvert was required to hold back water upstream and mimic pre-development flood events without increasing flood risk downstream.

Myton Green Drone Photos Sept 2021 (16).jpg

Solution

Our specialist team undertook watercourse modelling of the Myton Brook to determine the appropriate diameter of the culvert pipe required to mimic existing flows. By proposing a steel culvert pipe with splayed ends, we eliminated the need for costly and unsightly concrete headwalls, allowing the culvert to be mostly hidden from view.

Our civil engineers also designed earthworks for the large areas of open space on the site, providing a detailed 3D ground model from which the groundworks contractor could set out. Section 278 works on the A452 involved widening the existing road and a signalised 4-way junction.

We successfully supported our client throughout the planning process and gained local authority approvals.