๏ปฟ

Lea Bridge Road, London

We carried out energy calculations and EPCs for a residential development on Lea Bridge Road comprising 300 residential units and six commercial units across nine blocks.

Key details

Project name

Lea Bridge Road

ย 

Client

Hill Partnerships Ltd

Location

London

ย 

Services provided:

-ย Energy Assessments (SAP and SBEM/DSM)

- BREEAM New Construction 2014

- Reports to Discharge Planning Conditions 34 (Previously 33) and 35

Challenge

We conducted energy assessments to establish compliance with target water usage, as well as preparing reports to discharge Planning condition 34.

Residential development - Lea Bridge, London

Solution

We prepared a Water Conservation Strategy Report prior to ground works starting on site to discharge Planning condition 35. The scheme detailed measures to reduce water use within the development and demonstrated compliance with the target water use of 105 litres or less per person, per day.

On completion of the development, we prepared a Revised Energy Strategy Report to discharge Planning condition 34. This confirmed that the building was constructed in line with the measures defined in the approved energy strategy report at Planning stage. It exceeded Waltham Forest Core Strategy Policy DMN 10 requirements of 40% reduction in on-site CO2 emissions over 2010 building regulations, equivalent to 35% against Part L building regulation 2013.

It also demonstrated that our approach based on high insulation standards, very efficient building services, individual air source heat pumps, communal CHP and photovoltaics panels, was more appropriate for this site than the one that had originally been approved for planning.

ย 

Project statistics

300
Residential units
6
Commercial units
105
Target litres of water usage
40%
Reduction in on-site CO2 emissions

Related services

Load more services ยป

Get in touch

Your contact information:

All fields are mandatory *