All Oil and Gas projects have significant uncertainties, at least some of which lead to significant risks.

Capex Overruns
95% Average
97.4% Maximum

Opex Overruns
140% Average

First Oil
1-3 years behind

Production Rates
65% Average

Water Breakthrough
Quicker than predicted

Injection Rates
Always Overestimated



Utilising a unique, field-proven method combining a blend of both qualitative and quantitative methods, the experienced RPS Energy team will deliver an objective assessment, and practical action plans, to assist you in maximizing the value of your assets.